Notice ID
a93573cd7dbea1bab0fe646fa2e120c3
Contractor shall provide all labor equipment materials tools and supplies necessary to remove several interior sheetrock partition walls and doors in building 29 Holloman Air Force Base New Mexico There are approximately 3 walls to be removed The contractor will have to accomplish some patch work after the walls are removed in accordance with the Statement of Work The contractor will be required to construct one interior sheetrock partition wall to match the existing sheetrock walls in the facility Two electrical receptacles are to be installed in the new wall one on each side The contractor shall disconnect reroute and reconnect the electrical wiring in the walls as required Remove dispose and cap any wiring that will be rendered useless by the demolition operations The contractor shall remove and reinstall one thermostat including all necessary wiring and conduit All electrical work shall be performed by a licensed electrician All work shall be accomplished in accordance with the Statement of Work A site visit will be held on 1 Sep 99 at 900 AM Meeting place for the site visit will be front lobby of Building 29 Holloman Air Force Base New Mexico If you are planning on attending the site visit please call SSgt James Cunningham at 505 4752088 at least 1 day prior to the date of the site visit Quotations will be due in the Holloman Air Force Base Contracting Office no later than 200 PM on 10 September 1999 Award will be based on low bid
-
Department/Ind.Agency
DEPT OF DEFENSE
-
Subtier
DEPT OF THE AIR FORCE
-
Office
FA4801 49 CONS PK