Notice ID
6d3aa70ba69b09ecfee56d96582294d3
TitleRemove and replace the Emergency Generator Pad and associated equipment at bldg 1060 Beale AFB CA 95903 Description Furnish all labor supervision transportation equipment tools materials and operations as required to perform the following Remove and replace an emergency generator pad and associated equipment provide a complete electrically supervised emergency generator backup system at bldg 1060 Beale AFB Provide a temporary double throw switch 3 phase 200KVA 480V and distribution cables total approx 300 feet Switch the existing load to the temporary circuit for the duration of the contract performance period Remove existing concrete pad load cables conduits chain link fencing approx 73 lineal feet and fuel tank with concrete supports Lay new conduits cabling electrical ground system concrete pad and fencing Provide approx 60 lineal feet of buried cable conduit Provide a reinforced concrete pad type foundation not less than 8 inches thick Install approx 75 lineal feet of 8 tall chain link fence including a 4ft wide gate Install government provided 200KVA generator set automatic transfer switch double throw switch and surge suppressor on the line side of the ATS Provide and install a commercial breaker Provide and install channel iron support frame for commercial breaker and double throw switch Provide and install approx 300 feet of electrical distribution cable Provide the system complete and ready for operation Equipment materials installation workmanship inspection and testing shall be in strict accordance with the required and advisory provisions of the NEC NFPA 70 and IEEE C2 except as modified herein Furnish materials and equipment that are current products of one manufacturer regularly engaged in the production of such equipment EXISTING SYSTEM Contractor shall provide a temporary double throw switch connected to the polemounted transformers and circuits to the master switches at building 1060 and the tower The government will provide a temporary generator to connect to the double throw switch Contractor will be responsible to coordinate all power outages with Base Operations and minimize downtime CODES Contractor shall comply with the latest edition of the NEC NFPA 70 IEEE C2 for electrical and ASTM C39 ASTM C94 ASTM C150 ASSTM C309 AASHTO M182 COE CRDC400 NRMCA TMMB01 NRMCA QC3 for concrete and all other applicable laws and regulations QUALIFICATIONS OF INSTALLER Prior to installation submit data for approval of the Contracting Officer showing that the Contractor has successfully installed generator systems of the same type and design as specified herein or that he has a firm contractual agreement with a subcontractor having such required experience The data shall include the names and locations of at least two installations where the Contractor or the subcontractor referred to above has installed such systems The Contractor shall indicate the type and design of each system and certify that each system has performed satisfactorily in the manner intended for a period of not less than 18 months TECHNICAL REPRESENTATIVE Furnish the services of a qualified power production expert or technician experienced in the installation and operation of the type of system being provided to supervise the installation and testing including formal testing and adjustment of the system Magnitude of this project is between 2500000 and 10000000 SIC is 1542 The size standard is 17 Million This solicitation is open to all business concerns The entire solicitation will be released solely on the Electronic Posting System EPS wwwepsgov paper copies will not be available Any prospective bidders interested in bidding on this solicitation MUST register in order to be placed on the bidder list Include your company name address telephone number and point of contact fax number and email address This list is provided to facilitate subcontracting opportunities only Bidders registering their name on the source list should not conclude that they would receive a paper copy of the solicitation in the mail as a paper copy will not be available All prospective bidders are responsible to visit the EPS frequently and obtain any amendments or other information pertaining to this solicitation The solicitation attachments specifications drawings and bidders list will only be available by downloading the documents from the EPS Tentative date that solicitation will be released solely on the EPS will be 26 April 00 Tentative bid opening date will be 10 May 00 Specific issue and opening dates to be identified on solicitation When issued the solicitation package with the specifications will be available for download as word documents or zipped compressed files The drawings will be available for download as a selfextracting zip file Once executed the file will install the free SourceView reader and the drawings can then be viewed and printed A free evaluation version of Winzip can be obtained from httpwwwwinzipcomwinzipdownloadhtm once unzipped all files are word documents Any changes to solicitation documents or specifications will render them invalid Bids containing any changes will be rejected Contractors must be registered in the Centralized Contractor Registration in order to receive a contract award from any DOD activity Contractors may access the CCR at httpccredidisamil For more information concerning Business Opportunities at Beale AFB please visit our website at httpwwwbealeafmil9LG9CONSindexhtm
-
Department/Ind.Agency
DEPT OF DEFENSE
-
Subtier
DEPT OF THE AIR FORCE
-
Office
FA4686 9 CONS PKP