• 3d부스이미지-2
  • 3d부스이미지-1
  • 3d부스이미지-2
  • 3d부스이미지-3
  • 3d부스이미지-1
  • 3d부스이미지-2
  • 3d부스이미지-1
  • 3d부스이미지-3
  • 3d부스이미지-1
  • 3d부스이미지-2
  • 3d부스이미지-1
  • 3d부스이미지-2
  • 3d부스이미지-1
  • 3d부스이미지-3
  • 3d부스이미지-1

조회중입니다.

Contract

Contract Opportunity result Lists

Showing 3041 - 3050 of 7209467 results
favorite_border
favorite
R--MANAGEMENT, ORGANIZATIONAL AND BUSINESS IMPROVEMENT SERVICES (MOBIS), TFTP-MC-00-0874-1
Notice ID 7483774afaea4225d2038cbad9dd172b

No Description Provided

  • Department/Ind.Agency GENERAL SERVICES ADMINISTRATION
  • Subtier OFFICE OF ADMINISTRATIVE SERVICES
  • Office OFFICE OF MANAGEMENT SERVICES
  • Notice Type Award Notice
  • Published Date 2001-05-07 14:00:00+09
favorite_border
favorite
DEMOLISH AND REMOVE SEVEN BUILDINGS
Notice ID cfcc38caf2562b0b67aaa6a2e67f66a3

This presolicitation notice mistakenly went out as a small business setaside This project is a hub zone setaside The solicitation will be available on 7 May 01 on WWWEPSGov All offerors are responsible for downloading all information concerning this solicitation on this web site Statement of Work Bldg 406 Demolish and remove building 406 including all concrete foundation slabs piers walkways steps and ramps to the building Remove adjacent concrete slab and 4 steel bollards Relocate existing emergency eyewashshower station and pump shutoff switch Cap any utilities 2 feet below grade in accordance with Base Utilities Section requirements Compact and level site to match existing grade Spread minimum 2 disintegrated gravel to match surrounding landscape Statement of Work Bldg 473 Remove and dispose of asbestos containing material and lead based paint from Building 473 in accordance with the asbestos and lead based paint surveys Demolish and remove Building 473 including all concrete foundation piers entry steps ramps and walkways leading to the building Remove adjacent ramada concrete slab and CMU cooking grill Protect existing vegetation and landscaping to the greatest extent possible Cap all utilities per CE Utility shop requirements Level site to match existing grade Top with two inches disintegrated gravel to match surrounding grade and landscape Statement of Work Bldg 1360 Demolish and remove building 1360 including all concrete foundation slabs piers walkways steps and ramps to the building Cap any utilities in accordance with base Utilities section requirements Level ground to match existing grade and surrounding landscape Statement of Work Bldg 1001 Remove asbestos containing materials and lead based paint in accordance with the asbestos and lead based paint surveys Demolish and remove building 1001 including all concrete foundation slabs piers walkways steps and ramps to the building Remove small 108 sq ft concrete slab adjacent to building Cap any utilities in accordance with Base Utilities shop requirements Level ground to match existing grade and surrounding landscape Statement of Work Bldg 565 Perform Asbestos and Lead Based Paint surveys to determine amounts and locations of hazardous substances Remove asbestos containing materials and lead based paint in accordance with the asbestos and lead based paint surveys Demolish and remove building 565 including all concrete foundation slabs piers to the top of the bells walkways steps and ramps to the building Remove attached mechanical yard and all mechanical equipment Cap any utilities in accordance with Base Utilities shop requirements Level and compact ground in preparation for future construction Landscape site to match surroundings Statement of Work Bldg 793 OPTION 1 Remove asbestos containing material and lead based paint from building 793 in accordance with the asbestos and lead based paint surveys Demolish and remove superstructure of building 793 to 5 feet above grade remove brick structure to include above grade entrance steps handrails and mechanical equipment associated with the building Statement of Work Bldg 793 OPTION 2 Remove asbestos containing material and lead based paint from building 793 in accordance with the asbestos and lead based paint surveys Demolish and remove building 793 to 7 feet below grade including the concrete floor above the wet well to include above grade entrance steps handrails and mechanical equipment associated with the building Remove water from the wet well and fill the resulting hole with soil provided by the government All existing utility pipes will be abandoned in place Compact fill to 85 compaction and grade site to match surrounding slope Statement of Work Bldg 1079 OPTION 1 Remove asbestos containing material and lead based paint from Building 1079 in accordance with the asbestos and lead based paint surveys If surveys are unavailable consult base hazardous material manager for guidance Demolish and remove Building 1079 including all concrete foundation piers entry steps ramps and walkways leading to the building Remove and dispose 2 concrete step platforms and adjacent radar foundation to 2 feet below grade and backfill with soil Cap all utilities in accordance with Base Utilities shop requirements and level site to match existing grade Statement of Work Bldg 1079 OPTION 2 Remove asbestos containing material and lead based paint from Building 1079 in accordance with the asbestos and lead based paint surveys If surveys are unavailable consult base hazardous material manager for guidance Demolish and remove Building 1079 including all concrete foundation piers entry steps ramps and walkways leading to the building Remove and dispose 2 concrete step platforms and adjacent radar foundation to 2 feet below grade and backfill with soil Cap all utilities in accordance with Base Utilities shop requirements and level site to match existing grade Demolish and dispose of approximately 900 square yards of asphalt driveway surrounding building 1079 Regrade site to match surrounding slope The solicitation will be available on or around 4 May 01

  • Department/Ind.Agency DEPT OF DEFENSE
  • Subtier DEPT OF THE AIR FORCE
  • Office FA4887 56 CONS CC
  • Notice Type Presolicitation
  • Published Date 2001-05-07 14:00:00+09
favorite_border
favorite
J -- A-76 STUDY TO PROVIDE AIRCRAFT MAINTENANCE SERVICES AT EGLIN FLORIDA
Notice ID ce2bf89568d659c52ed04eb45b4e56d0

No Description Provided

  • Department/Ind.Agency
  • Subtier
  • Office
  • Notice Type Award Notice
  • Published Date 2001-05-07 14:00:00+09
favorite_border
favorite
SPRAY PAINT BOOT FILTERS
Notice ID b5054469bf0ddf39fb207c49516a45f2

No Description Provided

  • Department/Ind.Agency DEPT OF DEFENSE
  • Subtier DEPT OF THE AIR FORCE
  • Office FA4887 56 CONS CC
  • Notice Type Award Notice
  • Published Date 2001-05-07 14:00:00+09
favorite_border
favorite
TIRE INFLATION SAFETY GUARD
Notice ID ec5ea1ba31f58dc6ed9f639b7ab2a89c

TIRE INFLATION SAFETY GUARD PN 64E33077 APPL MULTI AIRCRAFT

  • Department/Ind.Agency
  • Subtier
  • Office
  • Notice Type Presolicitation
  • Published Date 2001-05-07 14:00:00+09
favorite_border
favorite
AUTOMATIC RIPCORD RELEASES (FF-2)
Notice ID bbbb01b57263cf847d98e1e927292b52

17 This is a combined synopsissolicitation for commercial items prepared in accordance with the format in Subpart 126 as supplemented with additional information included in this notice This announcement constitutes the only solicitation proposals are being requested and A WRITTEN SOLICITATION WILL NOT BE ISSUED The solicitation number for this procurement is F0960700T0052 and is issued as a Request for Quotation This solicitation document and incorporated provisions and clauses are those in effect through the Federal Acquisition Circular FAC 9715 Defense Acquisition Circular DAC 9113 and Air Force Acquisition Circular AFAC 962 The solicitation is unrestricted The North American Industry Classification System is 314999 The small business size is 500 The BID SCHEDULE shall be for Line Item 0001 Automatic Ripcord Release FF2 PN ID626812 1670ID626812 Line Item 0002 Cable and Housing PN BM626639503 1670BM626639503 Line Item 0003 Case Screw PN ID62100 5305ID62100 Line Item 0004 Dial Window PN ID62100 1670ID626772 Line Item 0005 Dial Knob PN ID626243 5355ID626243 DELIVERY Delivery is required by 150 days ADC and shall be delivered to 41 RQSDOJ PARARESCUE TEAM 7196 SAVANNAH STREET MOODY AFB GA 31699 FOB POINT Destination Provision at FAR 522121 Instruction to Offerors Commercial Items applies to this acquisition Quotation should be submitted and shall contain the following information SOLICITATION NUMBER TIME SPECIFIED FOR RECEIPT OF OFFERS NAME ADDRESS TELEPHONE NUMBER OF OFFEROR TERMS OF THE EXPRESSED WARRANTY PRICE ANY DISCOUNT TERMS AND ACKNOWLEDGEMENT OF ALL SOLICITATION AMENDMENTS Quote shall also contain all other documentation specified herein Signed quotes must indicate quantity unit price and total amount Offerors shall include a statement specifying the extent of agreement with all terms conditions and provisions included in the solicitation Offerors that fail to furnish the required representations or information or reject the terms and conditions of the solicitation may be excluded from consideration PERIOD OF ACCEPTANCE OF OFFERORS The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers unless another time period is specified in an addendum to the solicitation LATE OFFERS Request for Quotations or modification of proposals received at the address specified for the receipt of offers after the exact time specified for receipt of offers WILL NOT be considered EVALUATIONAWARD IAW FAR 522122 EvaluationCommercial Items the Government will award a purchase order resulting from this solicitation to the responsive responsible low offeror All offerors MUST BE CENTRAL CONTRACTOR REGISTERED CCR Information concerning CCR registration requirements may be viewed via the internet at httpwwwccr2000com or by calling the CCR Registration Centers at 18882272423 OFFERORS SHALL INCLUDE A COMPLETE COPY OF THE PROVISION AT FAR 522123 OFFEROR REPRESENTATIONS AND CERTIFICATIONSCOMMERCIAL ITEMS WITH THEIR OFFER The listed FAR clauses apply to this solicitation and are incorporated by reference All FAR Clauses may be viewed in full text by viewing the Federal Acquisition Regulation Table of Contents via the internet at httpfarsitehillafmil FAR 522124 Contract Terms and ConditionsCommercial Items FAR 522125 Contract Terms and Conditions Required to Implement Statutes or Executive OrdersCommercial Items Pursuant to FAR Clause 522125 the following clauses are hereby incorporated by reference FAR 522223 Convict Labor EO 11755 FAR 522333 Protest After Award 31 USC 3553 and 40 USC 759 FAR 522198 Utilization of Small Business Concerns and Small Disadvantaged Business Concerns 15 USC 637 d2 and 3 FAR 5222226 Equal Opportunity EO 11246 FAR 5222235 Affirmative Action for Special Disabled and Vietnam Era Veterans 38 USC 4212 FAR 5222236 Affirmative Action for Handicapped Workers 29 USC 793 FAR 5222237 Employment Reports on Special Disabled Veterans and Veterans of the Vietnam Era 38 USC 4212 FAR 522253 Buy American ActSupplies 41 USC 10 FAR 5222521 Buy American ActNorth American Free Trade Agreement Implementation ActBalance of Payments Program 41 USC 10 pubL103187 FAR 5224764 Preference for Privately Owned US Flag Commercial Vessels 46 USC 1241 FAR 5223233 Mandatory Information for Electronic Funds Transfer Payment FAR 522285 InsuranceWork on a Government Installation The following FAR Clauses apply if marked X FAR 5221421 Descriptive Literature X FAR 522196 Notice of Total Small Business SetAside The Defense Priorities and Allocations System DPAS rating is C9E RESPONSE TIME REQUEST FOR QUOTATION WILL BE ACCEPTED AT THE 347 CONTRACTING SQUADRON LOCATED AT 4380B ALABAMA ROAD MOODY AFB GA 31699 NO LATER THAN 200 PM EST ON 15 MAY 2001 ALL PROPOSALS SHALL BE MARKED WITH REQUEST FOR QUOTATION SOLICITATION NUMBER RECEIPT OF QUOTATION DATE TIME AND PROJECT TITLE ON THE OUTSIDE OF THE PROPOSAL ENVELOPE FACSIMILE OFFERS WILL BE ACCEPTED CONTRACTING OFFICER JEFFREY A PESKE The point of contact for this solicitation is Mr Steve Davis 2292573226 2292574032 fax

  • Department/Ind.Agency DEPT OF DEFENSE
  • Subtier DEPT OF THE AIR FORCE
  • Office FA4830 23 CONS CC
  • Notice Type Presolicitation
  • Published Date 2001-05-07 14:00:00+09
favorite_border
favorite
AIRFIELD PAVEMENT MARKING AND RUBBER REMOVAL
Notice ID 9d25c1cb40a2b40b171ad15ab9cfb89a

The scope of work includes but is not limited to annual airfield work at Fairchild AFB WA The work includes but is not limited to removal and disposal of rubber deposits of all types approximately 270000 sf annually from specified areas of Runway 0523 Remove and dispose of loose and flaking paint approximately 100000 sf annually from the airfield Layout work for new markings on specified areas of the airfield Provide traffic paint and reflective media to airfield pavement surfaces approximately 320000 sf annually Provide nonreflective traffic paint to airfield pavement markings from asphalticconcrete pavement approximately 2000 sf annually Protect traffic paint until dry and hardened sufficiently to withstand traffic The solicitation will encompass a base year and four option years Acquisition will be made using full and open competition and competitive negotiation procedures with qualified offerors The areas of evaluation and their relative rank order will be stated in section M of the solicitation The Government will award a contract resulting from the solicitation to the responsible offeror whose offer conforms to the solicitation requirements and will provide the best value to the Government considering Price and Past Performance Performance period for this project is a total of 50 calendar days for the base year delivery order and will be the same for each option year delivery order The performance period will be broken down further to allow contractor no more than 20 calendar days to prepare and submit material submittals for approval and to order and stockpile materials and no more than 30 calendar days to occupy work site and physically accomplish the work New submittals will be required for each annual delivery order Request separate Notices to Proceed NTP be issued for both performance periods with liquidated damages applying to each Rubber and paint removal shall be accomplished during the period beginning Thursday date unknown at this time at 1030 PM and ending Monday date unknown at this time at 600AM All pavement markings on the runway shall be accomplished during the period beginning Thursday date unknown at this time at 1030 PM and ending Monday date unknown at this time at 600 AM The specific dates will be known when the project receives funding Alternate dates due to adverse weather will also be provided the times will remain the same Estimated Construction cost range is from 500000 to 1000000 for the base year and the four option years The work is located in restricted and controlled areas There are no Government furnished materials for this project A solicitation will be issued on or about 4 June 01 Funding for this project is not available at this time When funding does become available all responsible sources may submit a proposal which shall be considered The NAICS code is 235210 The SIC code is 1721

  • Department/Ind.Agency DEPT OF DEFENSE
  • Subtier DEPT OF THE AIR FORCE
  • Office FA4620 92 CONS LGC
  • Notice Type Presolicitation
  • Published Date 2001-05-07 14:00:00+09
favorite_border
favorite
J -- A-76 STUDY TO PROVIDE AIRCRAFT MAINTENANCE SERVICES AT EGLIN FLORIDA
Notice ID 7ac2a3ba476f8a935ec46be2a89ac5b7

No Description Provided

  • Department/Ind.Agency
  • Subtier
  • Office
  • Notice Type Award Notice
  • Published Date 2001-05-07 14:00:00+09
favorite_border
favorite
ARCHITECT-ENGINEER (A&E) SERVICES
Notice ID e82976c27b585df39368f15377229279

This synopsis replaces the synopsis posted on 28 Apr 01 Title I Services A B and Title II Services C for Architectural Civil Mechanical Structural Environmental and Electrical Projects at Laughlin AFB TX will be required under this contract Computer Aided Design and Drafting CADD capability compatibility with Auto CADD Release 14 and capability to digitize existing drawings for CADD use are also required Delivery orders will consist of but not limited to 1 Making Technical Studies Analysis Surveys Investigations and Reports 2 Planning of Site Developments and Installations 3 Preparation of designs plans drawings and specifications 4 Supervising and Inspecting Maintenance Repair and Construction Projects and 5 Performing the necessary supervision and coordination of all phases of AE work One indefinite quantity contract will be awarded The relative order of importance of the criteria to be used to evaluate and select the A E firm is as follows Note Oral presentations will be required of approximately 3 to 6 of the highest rank firms The criteria for AE evaluation consists of the following a Professional Qualifications necessary for satisfactory performance of required services to include evaluation of professional disciplines and key personnel b Specialized Experience and Technical Competence in the type of work required including experience in energy conservation pollution prevention waste reduction and the use of recovered materials c Professional Capacity to accomplish the work within contract schedules considering timeliness of contract completion of services and delays Evaluation will also include quality control program innovative forms and patterns in building design prescribe metric standards AUTOCADD 14 document projects on CD and worksheets on Excel and preparing projectcontract documents for Internet advertising The following shall be submitted with the SF 254 and 255 1 quality control plan 2 awards andor samples of innovative forms and patterns in building design 3 evidence of the use of metric standards AUTOCAD 14 document projects on CD and worksheets on Excel and 4 samples of projectcontract documents that were used for internet advertising d Past Performance on contracts with Government agencies and private industry in terms of cost control quality of work construction inspectionsurveillance and compliance with performance schedules Telephone interviews with the references listed on the SF254 and 255 and references obtained using the central database will be the means of obtaining past performance data e Location in the general geographical area of the project and knowledge of the locality of the project f Commitment to SBA regarding the extent to which potential contractors identify and commit to small business to small disadvantaged business and to historically black college or university and minority institution performance as subcontractors g Volume of DoD Work during the previous 12 months and superior performance evaluations on recently completed DoD contracts Note Included in the evaluation is each firms ability to provide Title II Services in the form of construction inspection and surveillance Criterion d above 4 Rating Summary Each evaluator will be given a copy of ATC Form 319 ArchitectEngineer Selection Rating Summary sheet The seven criteria are ranked in order of importance Note Oral presentations will be required of approximately 3 to 6 of the highest rank firm and does not rank in the relative importance of the criteria listed below Point values shall be assigned to each criterion by the Preselection board as follows a Professional Qualification 27 points b Specialized Experience 25 points c Professional Capacity 20 points d Past Performance 15 points e Location 6 points f Commitment to SBA 4 points g Volume of DoD Work 3 points Total 100 points Bonus Oral Presentation 10 points TOTAL 110 points RATING CONSIDERATIONS A Professional Qualifications 27 points 1 Professional Disciplines Firms employing a complete inhouse staff offering basic professional disciplines of architectural civil structural mechanical electrical and environmental engineers Additional services of landscape architects asbestos designers fire protection engineers communications specification writers estimators geotech specialists surveyors and construction inspectors will be considered Firms that joint venture or subcontract a major part of the AE disciplines shall be required to provide resumes of the other firms Points shall be awarded accordingly 17 points High Range 13 to 17 points Firm have all basic professional disciplines and many of the additional services inhouse Mid Range 7 to 12 points Firm have at least half of the basic professional disciplines inhouse and all others with outside consultants Low Range 1 to 6 points Firm with less than three basic professional disciplines and all others are outside consultants 2 The type and quality of projects that key persons of the firm have been involved with in the past Refer to resumes on Form 255 10 points High Range 7 to 10 points Highly qualified staff experienced with projects similar to AF Base level projects Mid Range 4 to 6 points Staff moderately experienced with projects similar to AF Base level projects Low Range 1 to 3 points Staff with little to no experience on projects similar to AF Base level projects B Specialized Experience and Technical Competence in the type of work required including experience in energy conservation pollution prevention waste reduction and the use of recovered materials25 points Consider projects where the planning design and surveillance of both new construction and renovation of the following types of Housing Dormitories Lodging facilities Recreation facilities Pavements both base and airfield offices Aircraft Facilities Environmental POL repair and remodeling planning and other projects Consider basic professional disciplines and additional services per paragraph A Firms that design structures with finishes that are recyclable and recoverable for reuse Designs for minimum wastage of construction material Building design uses day lighting energy efficient fixtures and equipment that reduce owners building life cycle costs 1 Design experience on Air Force projects 10 points High Range 7 to 10 points Firm has accomplished projects for the Air Force in five or more of the types andor services Mid Range 4 to 6 points Firm has accomplished projects for the Air Force in three to four types andor services Low Range 1 to 3 points Firm or joint venture has accomplished projects for the Air Force in two or less types andor services 2 Design experience on DoD projects 5 points High Range 4 to 5 points Firm has accomplished many DoD projects in five or more of the types and services Mid Range 2 to 3 points Firm has accomplished DoD projects in three to four types and services Low Range 1 point Firm has accomplished DoD projects in two or less types andor services 3 Design Experience in NonDOD projects 5 points High Range 5 points Firm has accomplished many NonDoD projects in five or more of the types andor services Mid Range 3 to 4 points Firm has accomplished NonDoD projects in three to four types and services Low Range 1 to 2 points Firm has accomplished NonDoD projects in two or less types and services 4 Prescribe use of recovered and recyclable materials pollution prevention and minimize building waste in building construction 3 points High Range 3 points Firms that consistently prescribe these elements and projects that are successfully constructed using the same design Mid Range 1 to 2points Firms that occasionally prescribe these elements and few of those projects get constructed because the design was insufficient Low Range 0 points Firms that rarely prescribe these elements 5 Utilize or design energy efficient lighting electrical and mechanical equipment and energy efficient construction 2 points High Range 2 points Firms that consistently select and engineer these elements and projects that are successfully constructed using the same design Mid Range 1 point Firms that occasionally select and engineer these elements and few of those projects gets constructed because the design was insufficient Low Range 0 points Firms that rarely select and engineer these elements C Professional Capacity to accomplish work 20 points Consider all projects completed in the last five years Capacity to work within contract schedules Consider timeliness of contract completion of services and any delays Consider the firms program for check and balance of AE design work to provide highest quality of design work Consider postconstruction performance of the facilities design to determine how firms experience is compatible with the project requirements 1 Completed projects and workload 10 points High Range 7 to 10 points Firm shows evidence of steady workload of projects and always is ahead of design schedule Mid Range 4 to 6 points Firm shows evidence of uneven workload at times but meets design schedules Low Range 0 to 3 points Firm shows evidence of work overload and does not always complete work on design schedule 2 Program of Quality Control 4 points How does the firm ensure the highest quality of design work High Range 4 points Firm shows evidence of having a quality control plan together with specialized experience in continuous quality control improvement of design Mid Range 2 to 3 points Firm shows evidence of having and strictly adhering to the quality control plan Low Range 0 to 1 point Firm shows evidence of having a quality control plan 3 Innovative forms and patterns in building designs 2 points High Range 2 points Firms that have won five or more awards for their exceptional designs and completed projects Mid Range 1 point Firms that have five or less awards for their designs Low Range 0 points Firms that have one or no award for their designs 4 Prescribe metric standards AUTOCAD 14 document projects on CD and worksheets on Excel 2 points High Range 2 points Firm that has all of the above capabilities to produce documents inhouse Mid Range 1 point Firm that has some of the above capabilities to produce documents inhouse Low Range 0 points Firm that has none of the above capabilities to produce documents inhouse 5 Preparing projectcontract documents for Internet advertising 2 points High Range 2 points Firm that has prepared contract documents that have been advertised online including the use of Sourceview for construction bid by Government agencies Mid Range 1 point Firm that is currently preparing contract documents for online advertising for construction bid including the use of Sources for construction bid by Government agencies Low Range 0 points Firms that do not prepare contract documents for online Internet advertising including the use of Sourceview D Past Performance 15 points Past performance for design work shall be verified through telephone interviews conducted by the Preselection board with references listed in the AF Form 254255 The following topics will be discussed changes in design during construction construction award compared to cost estimate concepts design contract documents estimates construction inspection and surveillance accuracy completeness cooperation coordination management meeting schedules and work quality of past projects Firms SF 1421s obtained from the central database will also be reviewed The volume of DoD work provided within the last five years will be considered 1 Past performance of firm on contracts with DoD other than AF 5 points High Range 4 to 5 points Completed complex projects by the firm are of high quality and performance is exceptional Mid Range 1 to 3 points Completed complex projects by the firm are of satisfactory quality and performance Low Range 0 points Completed complex projects by the firm are not of high quality and unsatisfactory performance 2 Past performance of firm on contracts with NonDoD 5 points High Range 4 to 5 points Completed complex projects by the firm are of high quality and performance is exceptional Mid Range 1 to 3 points Produces work that is of satisfactory quality and performance Low Range 0 points Produces work that is not of high quality and unsatisfactory performance 3 Past performance of firm on contracts with the Air Force 5 points High Range 4 to 5 points Completed complex projects by the firm are of high quality and performance is exceptional Mid Range 1 to 3 points Completed complex projects by the firm are of satisfactory quality and performance Low Range 0 points Completed complex projects by the firm are not of high quality and unsatisfactory performance E Location of AE firm 6 points Firms located in close proximity of Laughlin Air Force Base shall be considered to be more readily available to resolve issues or expedient consultations Points shall be awarded to firms according to distance from LAFB High Range 5 to 6 points Within 0 to 250 miles from LAFB Mid Range 3 to 4 Points Within 251 to 500 miles from LAFB Low Range 0 to 2 points Beyond 501 miles travel distance from LAFB F Commitment to SBA 4 points Evaluators are tasked to include in their evaluation any due consideration for the extent to which offerors commit to small business small disadvantaged business historically black colleges and universities or minority institutions The following table shows the point allotment system for this criterion High Range 3 to 4 points Commitment to SBA fully documented and support provided Mid Range 1 to 2 points Commitment to SBA documented Low Range 0 point Commitment not documented G Volume of DoD Work 3 points Consider the volume of DoD work during the previous 12 months and superior performance evaluations on recently completed DoD contracts High Range 3 points Firms data showed superior performance evaluations and has a low volume of DoD work Mid Range 2 points Firms data showed superior performance evaluations and has a moderate volume of DoD work Low Range 0 1 point Firms data showed superior performance evaluations and has a high volume of DoD work Other Evaluation A Oral Presentations 10 bonus points Oral presentations will be required of approximately 3 to 6 of the highest rank firms Top firm oral presentation selection shall occur after the Final Selection Board evaluations of the DD254s and DD255s but prior to final rankings The Firms will be required to demonstrate how they are most qualified to provide AE Services by verbal presentation of their qualifications in regards to the six selection criteria Questions shall be prepared by the Final Selection Board and shall be provided to the firms selected to make oral presentations prior to the presentation date Using the data generated through the oral presentations a bonus point value will be developed in which points are assigned as follows High Range 7 to 10 points Offeror received Excellent ratings Mid Range 4 to 6 points Offeror received mainly Good ratings Low Range 1 to 3 points Offeror received mainly Satisfactory Ratings In addition to the above each firm shall be required to perform the following disciplines a Architectural including Landscape Architects b Civil Engineer General plus Airfield Design c Structural d Mechanical Primarily HVAC and Plumbing e Environmental Hazardous Waste Identification and Design and f Electrical Building Design Electrical Lighting and Underground Distribution Contractor is guaranteed a minimum of 500000 in fees The initial order issued against this contract may exceed 29900000 Each order after the initial delivery order shall not exceed 29900000 Fees under a particular indefinite delivery quantity contract may not exceed 75000000 for any year or option period The maximum dollar value of the total contract including option years is 375000000 Accomplishment time for the contract is 365 days with four oneyear option periods This project is open to small and large business firms The applicable North American Industry Classification System Code NACIS for this requirement is 541310 and the size standard is 4 million Those desiring consideration shall submit a Standard Form 254 and Standard 255 and the requested information mentioned above to the 47th Contracting Squadron Attn Michelle Bosarge 171 Alabama Ave Bldg 7 Laughlin AFB TX 788435102 no later than 4 Jun 01 This is not a request for proposal

  • Department/Ind.Agency DEPT OF DEFENSE
  • Subtier DEPT OF THE AIR FORCE
  • Office FA3099 47 CONF CC
  • Notice Type Special Notice
  • Published Date 2001-05-08 14:00:00+09
favorite_border
favorite
INSTALL NON-SKID, NON-ABSORBENT, POL RESISTANT EPOXY FLOOR
Notice ID cee36b53d35616533be1dac380d47e4d

The solicitation notice is hereby cancelled

  • Department/Ind.Agency DEPT OF DEFENSE
  • Subtier DEPT OF THE AIR FORCE
  • Office FA4887 56 CONS CC
  • Notice Type Presolicitation
  • Published Date 2001-05-08 14:00:00+09