The work shall consist of furnishing all plant labor equipment and materials to complete construction work Project NO PQWY 971017 to consist of 1 Joint and crack sealing in existing PCC 2 PCC slab replacement 3 Joint spall and patching repairs in existing PCC and 4 Temporary displacement of runway lighting system and pavement markings The magnitude of this construction is between 250000 and 500000 Performance period is 150 calendar days with on site work limited to 28 calendar days for runway work and 42 calendar days for C Ramp work There will be phasing involved in this project There will be an exclusion period between 15 Nov 99 and 01 May 00
-